Create a Management Station Schedule and Link a Data Point to it

  • System Manager is in Operating mode.
  1. Select the Manual navigation check box.
  1. Select Applications > Schedules > Management Station Schedules.
  1. Navigate to the Management View and select the field panel that contains the data point you want the schedule to control, drag the data point to the Outputs tab.
  • The system adds the point to the schedule.
  1. Click Save .
  • The management station schedule displays in System Browser.